Detachable modular container housing

Configure a Detachable Container House in Real Time

Build your modular space from real structural options, wall panels, finishes, bathroom pods and project packages — with a live 3D preview and estimated reference pricing.

Estimated from $958 / unit5950 × 3000 × 2800 mm4 workers · ~3 h · no craneFloor 17.85Volume 49.98
  • Export-readyFlat-pack logistics
  • Fast assembly12-step installation
  • Wall panel optionsEPS · Rock wool · PU
  • Project packagesCamps to resorts
Loading 3D preview…

Live Configurator

Configure your detachable modular unit

Select structure grade, wall panel performance, interior finishes and service-ready bathroom pods — with a live 3D preview and estimated reference pricing.

Loading 3D viewer…
2.2 mm · Quick-Assembly 2.2mm (Standard)Bubble wrap upgrade
FloorStandard PVC Floor Leather
Ext. wallStandard Steel Wall Panel
Inner wallSteel Inner Wall Panel
CeilingStandard Roof Ceiling

Select a standard use-case preset below to load its recommended frame system, bathroom pod, and add-on configurations automatically. You can customize them in the next steps.

Project Planner

Plan a multi-unit project by use case

Built for camps, offices, dormitories, clinics, schools, retail and hospitality. Add quantities per use case and we will structure the formal quotation around your deployment.

residential

Single Bedroom With Washroom

Reference Estimate
  • · Single bed with mattress
  • · Wardrobe
  • · Desk and chair
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, Smart Lock Package, N12170 bathroom pod

Units
0

site

Multi-person Dormitory

Reference Estimate
  • · Bunk beds
  • · Lockers or wardrobes
  • · Study desk
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, N18 bathroom pod

Units
0

office

Staff Office

Reference Estimate
  • · Office desk and chair
  • · Document cabinet
  • · Air conditioner
  • · Optional meeting table

Suggested: Air Conditioner Package, LED Exterior Lighting

Units
0

office

Senior Office

Reference Estimate
  • · Executive desk
  • · Sofa set
  • · Document cabinet
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, Panoramic Glass Front, LED Exterior Lighting

Units
0

office

Conference Room

Quote required
  • · Conference table
  • · Chairs
  • · Display wall
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, LED Exterior Lighting, Panoramic Glass Front

Units
0

commercial

Reception Area

Quote required
  • · Reception desk
  • · Waiting chairs
  • · Display cabinet
  • · Glass facade

Suggested: Panoramic Glass Front, LED Exterior Lighting, Front Canopy (Awning)

Units
0

commercial

Canteen / Commercial Kitchen Module

Quote required
  • · Commercial kitchen stainless steel package
  • · Canteen table and chair sets
  • · Refrigeration units
  • · Dishwashing and storage area

Suggested: Air Conditioner Package, High-performance Insulation

Units
0

commercial

Store / Retail Pop-up

Quote required
  • · Display shelving
  • · Counter
  • · Glass front
  • · Exterior lighting
  • + 1 more recommended items

Suggested: Panoramic Glass Front, LED Exterior Lighting, Front Canopy (Awning)

Units
0

public

Clinic Module

Quote required
  • · ABS manual hospital bed
  • · 304 stainless steel medicine cabinet
  • · Waiting chairs
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, High-performance Insulation, N12170 bathroom pod

Units
0

public

School / Classroom Module

Quote required
  • · Student desks
  • · Teacher desk
  • · Whiteboard
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, LED Exterior Lighting

Units
0

hospitality

Gym / Fitness Room

Reference Estimate
  • · Treadmill
  • · Adjustable bench
  • · Dumbbell rack
  • · Dumbbells
  • + 2 more recommended items

Suggested: Air Conditioner Package, LED Exterior Lighting, Gym Equipment Package

Units
0

site

Laundry Room

Quote required
  • · Washer extractors
  • · Tumble dryers
  • · Drainage system
  • · Washable wall finish

Suggested: High-performance Insulation, Rainwater Collection Tank, Laundry Equipment

Units
0

site

Security Room

Quote required
  • · Desk
  • · Chair
  • · Monitoring equipment space
  • · Air conditioner
  • + 1 more recommended items

Suggested: Air Conditioner Package, Smart Lock Package

Units
0

hospitality

VIP / CEO Suite

Quote required
  • · Queen bed with mattress
  • · Large wardrobe
  • · Bedside table
  • · Desk and chair
  • + 2 more recommended items

Suggested: Air Conditioner Package, Panoramic Glass Front, LED Exterior Lighting, Extended Outdoor Deck, N12190 bathroom pod

Units
0

Project Package Benchmarks

Bare Shell Unit

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Standard Export Unit

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Worker Dormitory Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Site Office Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Classroom Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Clinic Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Bathroom / Shower Module

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Resort / Hospitality Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Two-Storey Project

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Custom Project Package

Customizable by layout, quantity, destination, and configuration

Reference packageDetails required

Optional add-on packages

Commercial Kitchen Package

Configured by dining capacity, menu, destination country and utility standards.

  • 43 items configurable
  • Lead time: Approx. 15 working days depending on supplier
Quote required

Fitness Equipment Package

Configured by gym size, equipment grade, packing volume and destination.

  • 25 items configurable
  • Lead time: 10-30 days depending on supplier
Quote required

Furniture Package

Configured by room mix, quantity, furnishing grade and packing method.

  • 30 item groups configurable
Quote required

Appliance Package

Configured by voltage, plug standard, climate, quantity and warranty requirements.

  • e.g. 79 sets of 1.5HP wall-mounted AC
  • e.g. 4 sets of 2HP AC
Quote required

Technical System

Configured from real structural options

Every module is the same engineered system: a 5950 × 3000 × 2800 mm detachable frame with documented floor, roof and drainage assemblies — not a converted shipping box.

Galvanized steel frame

Corner columns, top and bottom frame beams and bolted corner joints form the load path. The frame is engineered for repeat disassembly and stacking.

Floor structure

Floor beams and purlins carry an MGO board deck finished with PVC floor leather as standard. Wet areas can switch to cement board.

Roof structure

Roof beams and purlins support glass wool insulation under an external roof sheet, with the ceiling layer closing the cavity from inside.

Drainage system

Integrated gutters collect roof runoff into concealed corner downpipes, keeping facades clean and discharging water away from the base.

16 structural components in every module

Roof purlinsGlass woolRoof sheetGutterRoof beamColumnDownpipeWall panelFloor beamCorner jointFloor purlinsMGO boardPVC floor leatherDoorWindowCeiling

Wall Panel Reference

Four insulated panel systems, compared honestly

Panel options balance waterproofing, fire rating, thermal performance, acoustics and cost. Select a panel in the matrix to update your configuration and the 3D model material.

Performance
Waterproof
Fireproof
Heat insulation
Sound insulation
Cost-effective
SuggestedStandard site office · Economic accommodationWorker accommodation · Staff officeExport premium projects · Cold climatesCold or hot climate · VIP suiteExtreme weather locations · Luxury resort cabins

Foundation Treatment

Four supported foundation conditions

Your foundation condition feeds directly into the quote summary. Foundation and civil works are excluded from module pricing unless separately quoted.

Applications

One module system, project-scale deployment

Worker camps
Office parks
Dormitories
Clinics
Schools
Retail & canteens
Resorts & hospitality
Emergency housing

Installation Process

From flat-pack delivery to handover in 12 documented steps

Four workers assemble one standard unit in about three hours — no crane, no welding, all parts man-portable. LEGO-style bolted assembly: frame first, roof before walls, services before handover.

4 workers

Small crew, no specialists required

~3 hours

Per standard unit, frame to lockup

No crane

All parts are man-portable

LEGO-style

Bolted assembly, zero welding

  1. 01

    Site & Foundation Check

    Confirm a level, load-bearing base — concrete slab, piers or hardened ground — per the selected foundation option.

  2. 02

    Unpacking & Parts Inventory

    Open the flat-pack bundle, verify all frames, panels and fastener kits against the packing list.

  3. 03

    Bottom Frame Positioning & Leveling

    Place the galvanized bottom frame on the foundation, level it and align the corner castings.

  4. 04

    Floor Boards

    Fix MGO boards (dry areas) or cement boards (wet areas) onto the floor purlins.

  5. 05

    Corner Columns

    Bolt the four corner columns into the bottom corner castings — no welding required.

  6. 06

    Top Frame & Roof Purlins

    Lift the top frame onto the columns, bolt the corner joints and fit the roof purlins.

  7. 07

    Roof Insulation & Roof Sheet

    Lay glass wool insulation between purlins and fix the external roof sheet.

  8. 08

    Gutters & Downpipes

    Install the integrated roof gutters and connect the concealed corner downpipes.

  9. 09

    Wall Panels

    Slot the insulated sandwich wall panels into the frame channels around the perimeter.

  10. 10

    Door, Windows & Joint Sealing

    Install the door and window packages, then seal all panel joints with silicone.

  11. 11

    Ceiling, Electrics, Floor Finish & Pod

    Fit the ceiling layer, connect pre-wired electrics and lighting, lay the floor finish and install the bathroom pod if selected.

  12. 12

    Inspection & Handover

    Run the drainage and electrical checks, complete the snag list, clean the unit and hand over.

Packaging & Transportation

Built to travel before it is built to live in

Flat-pack shipping

Each detachable module ships disassembled as a compact flat-pack bundle, protecting panels and frame members in transit.

Container-optimized

Bundles are dimensioned for standard container and breakbulk loading, reducing wasted volume and freight cost per unit.

Export documentation

Packing lists, loading plans and assembly references are prepared per shipment for customs and site teams.

Site logistics

Unloading equipment, local transport and installation labor are arranged locally or quoted separately on request.

Excluded unless separately quoted

  • Freight and destination port charges
  • Customs duty and import taxes
  • Local installation labor unless quoted
  • Foundation and civil works
  • Electrical materials and piping accessories for bathroom pod unless quoted
  • Final engineering drawings and local certification fees
  • Site utilities connection
  • Cranes, forklifts or unloading equipment

Quote Request

Turn your configuration into a formal quotation

Reference estimate only. Final quotation requires quantity, destination, drawings and installation conditions.

Configuration summary

Estimated from $1,000 · reference only

Module model
Classic Detachable Module · 5950 × 3000 × 2800 mm
Storey layout
Single-storey Unit
Quantity
1 unit
Frame system
Quick-Assembly 2.2mm (Standard)
Packing configuration
Bubble wrap upgrade
Door configuration
Standard steel door (included)
Window option
Standard double-glaze window (Front Wall: 1)
Structure grade
Basic — Cost-effective structure
Wall panel
EPS Panel (50mm)
Exterior color
Warm White (RAL 9002)
Floor finish
Standard PVC Floor Leather
External wall finish
Standard Steel Wall Panel
Inner wall finish
Steel Inner Wall Panel
Ceiling finish
Standard Roof Ceiling
Bathroom pod
None
Add-ons
None
Foundation
Place directly on concrete floor
Primary use case

Reference estimate only. Final quotation requires quantity, destination, drawings and installation conditions.

Upload drawings (placeholder)

Estimated reference only. Final quote depends on quantity, configuration, destination, and shipping.